Active, Beautiful, Clean Waters (ABC Water) - Kallang River 加冷河 @ Bishan-Ang Mo Kio Park

 Active, Beautiful, Clean Waters (ABC Water) - Kallang River 加冷河 @ Bishan-AMK Park (2020 0824)


Kallang River at Bishan-Ang Mo Kio Park project is a joint collaboration between PUB and NParks to turn a concrete canal into a picturesque river teeming with life. Under the ABC Waters Programme, a combination of plants, natural materials such as rocks, and civil engineering techniques were introduced to soften the edges of the waterway, give it a natural appearance and prevent soil erosion. Known as soil bio-engineering, this is the first time that such techniques have been explored in Singapore. Approximately 10 different types of bio-engineering techniques were tested for 11 months before installation. With the river naturalized, wildlife has been attracted to the area. Creatures such as the Common Bluetail damselfly and Common Scarlet dragonfly now frequent the riverbank, adding to the biodiversity of the park. The river channel itself was designed based on a flood plain concept and is linked to a network of drains in the city. During dry weather, the flow of water is confined to a narrow stream in the middle of the river. In the event of a storm, the adjacent park area doubles up as a conveyance channel, carrying the rainwater downstream gradually

 Location: Block 241 (Bishan Street 25)

Route 1: MRT Ang Mo Kio/Bus Interchange board Bus Services 132, 133, 136, 165, 166, 169 and 262 

Route 2: Opp Bishan Stn Stop ID: 53239 Bus 13/52/54/88 Blk 257 Stop ID: 53371 for 3 stops




























Comments