Rail Corridor - Rail Corridor North to Hillview Sector (2023 0210)
Locate: Opposite MRT Kranji
Getting There:
MRT Kranji (NS) Exit C and cross the overhead bridge
MRT Hillview Station (DT), and take a three-minute walk from Exit B to the access path leading to Rail Corridor (North).
Rail Corridor (North) opens with new nature trail & lookout deck, offers 21km of connectivity from Kranji to Spooner Rd.
Kranji Node - has a nature trail that’s connected to a 2000 sqm field for future community events and a 250m nature trail that links to the main Rail Corridor.
Exit to Opposite Kranji War Memorial
Infront is old Railways Track to Woodland (JB)
Exit to Jalan Bumbong Estates
Exit to Kranji-Mandai PC
Crossing Sungei Kadut Avenue
Exit to Pang Sua (North Bank) Park Connector
Crossing Stagmont Ring
Diverted Route via Woodlands Road
Turn into Railways Corridor after the Bus Stop
Rail Crossing Bridge over Pang Sua River
Walk along Woodlands Road until Junction 10
Crossing Choa Chu Kang Road
Entrance Railways Corridor
Rail Corridor Test Track
Sri Murugan Hill Temple
Exit Opposite The Liner Condominium complex Stop ID: 44011
Exit Opposite Hazel Park Terrace (MRT Cashew DT2)
Crossing Gombak Drive (MINDEF)
Diverted Route to Woodlands Road
New bridge over Hillview Road — it even has tracks embedded into its flooring as a nod to the original bridge’s function as a crossing for the former KTM Railway.
6m-high lookout deck boasting scenic
Hume Avenue
Upper Bukit Timah Truss Bridge
9 Mile Platform
Rail Mall
Comments
Post a Comment